t shirt order process

The T-Shirt Order Process, Stage by Stage

Orders rarely fail at production. They fail in the gaps between stages — the week lost between approving a sample and paying the deposit, or the day lost because a PO number was missing from an invoice. Knowing the eight stages tells you which gap is yours.

Send the weight, colour, fit and quantity. We return a unit price per quantity tier within 24 hours.

Stages
8
Stock order
Under 2 weeks
Production order
10–13 weeks
Where orders stall
Approval to deposit

The eight stages

Every order, stock or production, moves through the same eight gates. What changes is which ones take days and which ones take weeks.

The two stages buyers consistently underestimate are stage 4 (approval to deposit) and stage 8 (customs clearance), because neither is production work and both can consume a week.

  • 1 — Enquiry: quantity, size curve, colour, deadline, destination.
  • 2 — Quote: price with basis stated, lead time, what is excluded.
  • 3 — Sample: 7–10 days including decoration; wash it twice.
  • 4 — Approval and deposit: the stage that silently eats a week.
  • 5 — Production scheduling: 25–35 days from approval, capacity-dependent.
  • 6 — Inline and final inspection: your gate, not ours.
  • 7 — Shipment: ocean 30–40 days, air 5–10, express 3–7.
  • 8 — Customs, duty and inland delivery: 5–10 days, variable.

Stage 1–2: what makes a quote accurate

A quote built on a guessed quantity is wrong for both sides. Send the real number and the real deadline together: a genuine deadline changes the shipping mode, which changes the landed cost more than the unit price does.

Also send the destination. FOB and DDP differ by the entire freight and duty line, and the same shirt can be quoted at two very different numbers depending on which one you want.

Stage 3–4: the sample is a gate, not a courtesy

The sample exists to be rejected. Measure it against the size chart, stretch the neck twice, look at the print edge under raking light, then wash it twice at 40°C and measure again. Shrinkage and cure failures only appear after the wash.

Then the gap: approval to deposit. On a production order this is where a week disappears because a PO needs internal sign-off. Book it in advance or accept the slip.

Stage 5–6: production and inspection

Production is scheduled after the deposit, not after the enquiry. A supplier who says "we will start Monday" before the deposit has arrived is describing hope.

Inspection is the buyer’s responsibility. A third-party inspection before final payment costs a few hundred dollars and is the only objective check that the bulk matches the sample. Suppliers who resist it are telling you something about what it would find.

Stage 7–8: shipping and customs

Choose the mode against the deadline, not against the freight quote: air costs more per kilogram but can be cheaper per day of delay avoided. For stock orders none of this applies — the goods are already through customs.

Customs is the least predictable stage. Have the HS code, the declared value and the entry documents ready before the vessel sails, not when it arrives.

Specifications

Enquiry to quoteSame or next business day
Sample7–10 days
Production25–35 days after approval
Ocean freight30–40 days port to port
Customs and inland5–10 days
Total production order10–13 weeks
Total stock orderUnder 2 weeks

Frequently asked questions

How long does a stock order take?

Quote same or next day, dispatch in 2–5 business days, domestic delivery 2–6 days — under two weeks end to end.

What is the actual production lead time?

25–35 days after approval and deposit, plus sample time and freight. Plan 10–13 weeks door to door.

When does production start?

After the deposit clears, not after the enquiry. Any other answer is optimism.

Who arranges inspection?

You do. It is the buyer’s gate and it should happen before final payment.

What do I need for customs?

The HS code, declared value per unit, commercial invoice, packing list and bill of lading. Confirm the classification with a broker before shipping.

Send the spec — quote in 24 hours

A fabric swatch and a sewn sample come before the bulk run, and finished goods are photographed before packing.